British Broadcasting Corporation

Official Scientific Report of NMR PIPETECTOR Installation Anti-Corrosion Equipment, British Broadcasting Corporation

Appearances

  • British Broadcasting Corporation Appearance of the building
  • British Broadcasting Corporation Condensate water supply pipe headers

Installation Purpose and Result

British Broadcasting Corporation in London is the national broadcasting company in the United Kingdom built in 1953. One of the BBC buildings where the television programs being made for the White City area in London have had major problem of corrosion in the iron pipework of the condensate water pipework system involving the cooling towers, so NMR Pipetector was adopted by the TV station. For the protection of the condensate water pipework system from internal corrosion in the Main Block Building and in the Stage 5 Building, four units of NMR Pipetector PT-250DS were installed onto the 10 inches diameter independent condensate water pipework systems.

32 days after the installation, Fe content in water considerably decreased from 5.53 mg/l to 0.048 mg/l in the Main Block Building and 3.8 mg/l to 0.063 mg/l in the Stage 5 Building. 57 days after the installation, the Fe content stayed at low of 0.06 mg/l in the Main Block Building and 0.008 mg/l in the Stage 5 Building.

This indicates that new forming of corrosion (FeO(OH)) inside the pipework was immediately terminated and the existing corrosion was reduced to magnetite (Fe3O4) which does not dissolve into water. NMR Pipetector protects inner pipe from any internal corrosion until the life duration of the TV station.

Installation Summary

Name and Location of Building British Broadcasting Corporation

BBC Television Studios, White City, London, UK

Building Summary One of the BBC television studios buildings
Installation Day April 20 2006
Installation Place and Amount

10 inches diameter pipes of the condensate water supply system coming from the cooling towers in the Main Block and Stage 5 Building.

PT-250DS × 4 units

Change of Fe Content in Water(㎎/ℓ)

Change of Fe Content in Water

Fe Content in Condensed Water(㎎/ℓ)

Installation Building Installation Date After 32 Days After 57 Days
Fe Content in Water Main Block Building 5.53 0.048 0.06
Stage 5 Building 3.8 0.063 0.008