Here are some feedbacks from our customers who are actually using NMR Pipetector.

  • VOICE #01
    "NMR Pipetector helped us increase the asset value!"

    A case study at an apartment with 560 families in Fuchu City, Tokyo | August 2001

  • VOICE #02
    "We managed to improve red rust blockage inside our water piping without replacing it to stainless steel pipe!"

    A case study at buildings G, H, I, J and K in a condominium in Minato, Tokyo | August 1996

  • VOICE #03
    "Discolored water became crystal clear!"

    A case study at a major hospital in Ibaraki City, Osaka | March 2007

  • VOICE #04
    "Our production line is operating with almost no line stoppage."

    A case study at a major automobile maker Kyushu factory in Japan | August 1998

  • VOICE #05
    "No red rust has formed since the introduction to our new building 18 years ago."

    A case study on a local government-owned hospital in Kawasaki City, Japan | January 2007


VOICE #01
"NMR Pipetector helped increase the asset value!"

voive#01

A case study at an apartment with 560 families in Fuchu City, Tokyo

NMR Pipetector installation date: August 2001

A 25-year-old building had several red rust blockage progressing at dissimilar metal joints in its domestic cold-feed water piping. In order to avoid pipe replacement that could take place in the near future, NMR Pipetector, which costs less than 1/10 of pipe replacement, was installed before the red rust blockage progresses further. As a result, the blockage in the joints improved as the red rust was reduced to black rust as shown below. The management association of the apartment excluded the planned cost of major pipe replacement from their operating budjet and used the extra budget to improve the apartment asset value, such as exterior painting and rooftop waterproofing.

*Most domestic cold-water pipes are vinyl chloride lining steel pipes, a kind of steel pipe whose inner surface is coated with vinyl chloride. Red rust develops at pipe joints where vinyl chloride cannot cover physically, and this makes residents difficult to notice issues regarding corrosion since water discoloration is hardly seen from vinyl chloride piping. As pipe inside gets narrow with red rust, water pressure cannot rise, and entire piping is exposed to a very heightened risk of water leaks. Even worse, worn-out pipe joints may drop off due to vibration caused by earthquake.


VOICE #02
"We managed to improve red rust blockage inside our water piping without replacing it to stainless steel pipe!"

voive#02

A case study at buildings G, H, I, J, and K of a condominium in Minato Ward, Tokyo

NMR Pipetector installation date: August 1996

A 12-year-old condominium was considering replacing its domestic cold-water piping to stainless steel pipe to prevent red rust blockage inside. However, the cost for the replacement was estimated at about a million U.S. for each building, so the condo installed NMR Pipetector instead, which costed less than 1/20 of that of pipe replacement work.

Red rust reduction in a pipe seen with endoscopy

Before installation After 12 months After 27 months Blockage Improvement
House No.1
77.5%

60.0%

58.5%
Improved by
19.0%
House No.2
37.3%

31.0%

23.3%
Improved by
14.0%

Blockage ratios were measured at two kitchens' water pipe joints in two different houses before installing NMR Pipector. After 12 months, the ratio at a pipe joint was reduced to 60% from 77.5%, and the ratio at the other pipe joint was reduced to 31% from 37.3%. After 27 months, the ratios were further reduced to 58.5% and 23.3% at the two pipe joints respectively. These results proved that the red rust blockage greatly improved by being reduced to black rust.

*JSP arranges a scientific report for any buildings/facilities we implement a site survey on vinyl chloride lining steel pipe.

*Please note that endoscopic survey is only for buildings in Japan


VOICE #03
"Discolored water became crystal clear!"

voive#03

A case study at a major hospital in Ibaraki City, Osaka

NMR Pipetector installation Date: March 2007


VOICE #04
"Our production lines are operating with almost no line stoppage."

voive#04

A case study at a major automobile maker Kyushu factory in Japan

NMR Pipetector installation date: August 1998


VOICE #05
"No red rust has formed since the introduction to a new building 18 years ago."

voive#05

A case study on a local government-owned hospital in Kawasaki City, Japan

NMR Pipetector installation date: January 2007