Office Victoria

Office Victoria is located next to the Thistle Westminster Hotel, where Pipetector is also adopted, and the office is managed by Land Securities, one of the UK’s leading property companies.

To protect its hot water pipework from internal corrosion, the office installed one Pipetector PT-50DS on a 2-inch hot water cylinder connected to a galvanized steel flow pipe on January 5, 2007.

After 24 days, the average iron-ion content in the water considerably dropped from 1.93 mg/ℓ to less than 0.007 mg/ℓ and was kept at 0.01 mg/ℓ after 35 days.

These iron-ion contents were much lower than the British standard for drinking water quality at 0.2 mg/ℓ. It means Pipetector immediately terminated the new formation of corrosion inside the pipework and reduced the existing corrosion into magnetite, which does not dissolve in water. Pipetector will now protect inside the pipework from any internal corrosion.

Profile

NameOffice Victoria
LocationBuckingham Palace Road, London SW1W 0QT, UK
TypyAn office building
Installation dateJanuary 5, 2007
Installation pipe2-inch galvanized steel hot water cylinder, PT-50DS × 1

Change in iron-ion content in water

Change in iron-ion content in water
Before
installation
Dec. 29,
2006
After 24 days
Jan. 29, 2007
After 35 days
Feb. 9, 2007
After 150 years
Jun. 4, 2007
British
Standard for
Drinking
Water
Fe
content
(mg/L)
1.97
(8th floor)
<0.007
(4th floor)
<0.007
(5th floor)
<0.007
(4th floor)
0.2
1.89
(3th floor)
<0.007
(4th floor)
<0.007
(6th floor)
<0.007
(4th floor)
0.012
(7th floor)
0.015
(7th floor)
Average1.93<0.007<0.0070.01

Certificate of water quality analysis

Before installation
Before installation
After 24 days
After 24 days
After 35 days
After 35 days
After 150 days
After 150 days

Related links

Copied title and URL