We are looking for sales reps worldwide! » click here

Factories-JPN

Factories-JPN

DPE Factory

Pipetector was installed on the outlet pipe of elevated tank at the photo service factory building in November 2000. It has been 35 years since this building was built, and since the water supply pipe was made of Steel Galvanized Pipe (SGP), it was suffering from red colored water. Other methods such as magnet, electric power, and ceramics can wash off corrosion developed inside pipework to worsen the...
Factories-JPN

Food Factory in Shizuoka Prefecture

The food factory It has been 11years since the food factory was built, and High Impact Vinyl Pipes (HI-VP) have been used. The factory has used well water. Generally, well water has more bacteria than tap water, and it causes to form and grow slime easily. Pipetector was installed in order to prevent growing the bacteria in the cooling tower of the food factory. As the result, algae of the cooling t...
Customers

Nissan Motor Co., Ltd. (Kyushu Factory)

Before the installation Magnetite 4.0% Inside of the cooling water pipe was seriously blockaded caused by corrosion. Therefore, the clogged cooling water pipe for the welding robot stopped the whole production line often. 9 months after the installation Magnetite 43.6% The corrosion was reduced to magnetiteand clogs of the cooling water pipe disappeared. So, the whole productio...
Copied title and URL