We are looking for sales reps worldwide! » click here

Mandarin Oriental Hyde Park London

Mandarin Oriental Hyde Park London had major problems with internal corrosion in its galvanized steel domestic hot water system supplying hot water to bathrooms and kitchens throughout the hotel. To eliminate issues regarding internal corrosion, single-cell bacteria and electrolysis between steel and copper, the hotel installed two Pipetector PT-75DS on its two main domestic hot water supply pipe headers connected to main boilers.

Mandarin Oriental Hyde Park London

Four weeks after the installation, the level of iron-ion in water was considerably reduced to 0.0043 mg/ℓ from 13.35 mg/ℓ before the installation. It further decreased to 0.0335 mg/ℓ after eight weeks.
It means Pipetector immediately terminated the new formation of corrosion inside the pipework and reduced the existing corrosion to magnetite, which does not dissolve in water. Pipetector will provide the hotel with complete protection against internal corrosion and single-cell bacteria for over forty years.

Mandarin Oriental Hyde Park London

Installation Summary

NameMandarin Oriental Hyde Park London
Location66 Knightsbridge, London SW1X 7LA, UK
ProfileHotel built between 1888 and 1891
Installation dateJuly 15, 2014
Installation location,
product mode and number
Main domestic hot water pipe headers, PT-75DS × 2

Change in iron-ion contents in water

Mandarin Oriental Hyde Park London
Before
Installation
Nov. 6, 2013
After 4 weeks
Aug. 12, 2014
After 5 weeks
Aug. 19, 2014
After 6 weeks
Aug. 27, 2014
After 7 weeks
Sep. 2, 2014
After 8 weeks
Sep. 9, 2014
mg/ℓ13.350.0043<0.0040.0257<0.0040.0335

Related links

Copied title and URL