Customers Installation at District Heating System in North Asia
Japan System Planning Co. installed its anti-corrosion device, Pipetector, on the main pipe of a three-mile-long district heating pipe network on April 17, 2019. To evaluate the effectiveness of the device, a two-stage assessment was conducted.
As the primary evaluation method, filters were attached to a valve within the system before and after installation of the device to measure the level of iron-ion content...
